Measurements had already been taken and product had already been ordered by the time VM was hired to install the product. VM hit the ground running and met every challenge posed to them on the project. Grooves needed to be routed on the backside of a good amount of panels, panels had to be cut to size in order to allow for proper installation, additional break metal was required, which VM fabricated in its shop.  The installation of 4,400 Sf of panel was completed in six weeks.

Location: Toledo, Ohio
Contract Awarded on: February 2012
Completion Date: March 2012
Product Installed: 8 mm Aluminum Composite Panels